User Manuals
- Additional Counters User Manual - Running Hours Module
- Additional Incident Information
- All Details on Signing Out a Job
- Certificate Module
- Circulating Components
- Component Form Details
- Connecting and Removing Spare Parts To Components
- Create/Re-create a Forecast
- Details for the Pro forma Invoice Form
- Document Handling User Manual
- Due Jobs in Transit
- Forecast User Manual
- Holding Bay
- How Can a User Assigned an Action Find it and Sign it out
- How Does the Movable Assets Module Work
- How to add a cargo?
- How to add a port to a voyage?
- How to add a port/sailing event (to current voyage)
- How to add a port/sailing event template?
- How to Add Actions to an Observation
- How to Add Additional Suppliers to a Spare Part
- How to Add and Withdraw an Amount of Items to Stock, Directly in the Item Form
- How to add cargo figures?
- How to add Incident consequences
- How to Add Stock Items (spare parts and catalogue items) to a Location?
- How to Add Stock Locations and Sub Locations
- How to approve a voyage?
- How to calculate consumption in the voyage log
- How to Cancel an Observation
- How to change the scale in the timeline view
How to Set an Asset to Active on Board From the Holding Bay
- Go to Movable Assets → Holding Bay
- Select the ‘Movable Components’ or the ‘Stock Locations’ tab
- Drag and drop the asset from the right-hand side of the screen to the structure on the left
Or
Click the button in the ‘Assigned Parent’ column and choose which component/location the asset should be placed under
- Repeat steps 1 through 3 for each asset you wish to place into the structures
- Click the ‘Commit Changes’ button to save the changes you’ve made and set the assets to active on board.
Note: There is a feature for office users to plan where an asset should be placed into the structure of the receiving unit. This feature is called ‘Planned Parent’ and is a field available within the details of each pro forma invoice line. Clicking the ‘Insert Planned Assets’ button at the bottom left of the Holding Bay view, will automatically insert these ‘Planned’ assets into the structure, but the user will still need to click ‘Commit Changes’ for the operation to be completed.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article